/* bread crumbs*/

Wilderness Survival

A group is left in a  jungle to find for themselves from the natural....

Learning Objectives/Desired Outcomes

Strategy and planning, Problem solving and decision making, Resource allocation and management, Creative thinking, Collaboration and Teamwork.

Target Group:

Junior, Middle and Senior Management.

Methodology:

A group is left in a  jungle to find for themselves from the natural resources which includes making fire, shelter, finding food, water and survive the night in the wilderness.

Requirements/Props:

Match boxes, Tarp, Newspapers, Twine, Shovel, Metal Coffee can, Bandana.

Time Duration:

90 minutes to 180 minutes.

Number of Participants:

5-50.

Preferred Setting:

Outdoor.



Raft Making               

The team is provided with basic materials needed and knot techniques....

Learning Objectives/desired outcomes

Time management, Creativity, Teamwork, Resource Management, Competitive Spirit, Relationship Management.

Target Group:

Junior, Middle and Senior Management.

Methodology:

The team is provided with basic materials needed and knot techniques to build the raft and make it functional.

Requirements/Props:

Logs, ropes, tubes.

Time Duration:

90 minutes to 180 minutes.

Number of Participants:

20-800.

Preferred Setting:

Indoor/Outdoor.



Twin Rope Exercise

Participants walk in pairs over low ropes, synchronizing and....

Learning Objectives/Desired outcomes

Synchronizing, Team Building, Managing Disagreements, Trust, Motivation.

Target Group:

Junior, Middle and Senior Management.

Methodology:

Participants walk in pairs over low ropes, synchronizing and integrating with each other from Point A to Point B.

Requirements/Props:

Ropes, Stools/Chairs.

Time Duration:

45 minutes to 60 minutes.

Number of Participants:

4-20.

Preferred Setting:

Outdoor.



Tyre Obstacle               

Participants walk on tyres from point A to Point B at....

Learning Objectives/ Desired Outcomes:

Teamwork, Collaboration, Lateral thinking, Innovative thinking, Time Management.

Target Group:

Junior and Middle Management.

Methodology:

Participants walk on tyres from point A to Point B at the shortest possible time.

Requirements/Props:

Tyres.

Time Duration:

45 minutes to 60 minutes.

Number of Participants:

12-50.

Preferred Setting:

Indoor/Outdoor.



Drums and Planks

Teams have to cross a path with limited resources with few....

Learning Objectives/ Desired Outcomes:

Resource Management, Conflict Resolution, Decision making, leadership, risk taking, self motivation.

Target Group:

Junior, Middle and Senior Management.

Methodology:

Teams have to cross a path with limited resources with few planks and drums amongst constraints.

Requirements/Props:

Drums, planks, blindfolds.

Time Duration:

60 minutes to 90 minutes.

Number of Participants:

10-12.

Preferred Setting:

Outdoor.



Fire Walk               

Participants walk on fire under certain conditions by the....

Learning Objectives/ Desired Outcomes:

Breaking barriers, self confidence building, risk taking, challenging phobias, right attitude.

Target Group:

Junior, Middle and Senior Management.

Methodology:

Participants walk on fire under certain conditions by the instructor.

Requirements/Props:

Time Duration:

60 minutes to 120 minutes.

Number of Participants:

10 to 100 .

Preferred Setting:

Outdoor.



Paint Ball

Groups of players shoot balls of paint at one another. The....

Learning Objectives/ Desired Outcomes:

Resilience, Patience, Planning, Fun.

Target Group:

Junior, Middle and Senior Management.

Methodology:

Groups of players shoot balls of paint at one another. The paintball explodes on impact, leaving a splotch of bright paint on the player’s clothes. The objective is to stay in the game as long as possible without being hit.

Requirements/Props:

Paint Ball Activity Props.

Time Duration:

90 minutes to 120 minutes.

Number of Participants:

10-50.

Preferred Setting:

Outdoor.



Rappelling

Breaking the descent from heights in a controlled way. It....

Learning Objectives/ Desired Outcomes:

Facing Fears, Risk Taking, Motivation, Confidence Building, Trust.

Target Group:

Junior, Middle and Senior Management.

Methodology:

Breaking the descent from heights in a controlled way. It requires sliding across a path by means of a rope and one's security is assured by use of good knotting techniques, harness or other safety equipment.

Time Duration:

60 minutes to 120 minutes.

Number of Participants:

5-50.

Preferred Setting:

Outdoor.



Rock Climbing

Participants climb up, down or across natural rock formations....

Learning Objectives/ Desired Outcomes:

Facing Fears, Risk Taking, Motivation, Confidence Building, Trust.

Target Group:

Junior, Middle and Senior Management.

Methodology:

Participants climb up, down or across natural rock formations or artificial rock walls.

Requirements/Props:

Time Duration:

60 minutes to 90 minutes.

Number of Participants:

Preferred Setting:

Outdoor.



Valley Crossing

Participants traverse from one mountain to another across....

Learning Objectives/ Desired Outcomes:

Facing Fears, Risk Taking, Motivation, Confidence Building, Trust.

Target Group:

Junior, Middle and Senior Management.

Methodology:

Participants traverse from one mountain to another across a valley using nothing but ropes whose two ends are securely fastened on the two mountains. Participants then wear a harness and mount the ropes to traverse several feet above the ground.

Requirements/Props:

Time Duration:

60 minutes to 90 minutes.

Number of Participants:

8-100.

Preferred Setting:

Outdoor.



Zip Line

Participants propel to travel from the top to the bottom of the....

Learning Objectives/ Desired Outcomes:

Facing Fears, Risk Taking, Motivation, Confidence Building, Trust.

Target Group:

Junior, Middle and Senior Management.

Methodology:

Participants propel to travel from the top to the bottom of the inclined cable by holding on to or being attached to the freely moving pulley.

Requirements/Props:

Time Duration:

60 minutes to 90 minutes.

Number of Participants:

5-50.

Preferred Setting:

Outdoor.



Burma Bridge

Participants cross a high rope Burma bridge from start to....

Learning Objectives/ Desired Outcomes:

Achieving personal Goals, Risk Taking, Motivation.

Target Group:

Junior, Middle and Senior Management.

Methodology:

Participants cross a high rope Burma bridge from start to end point.

Requirements/Props:

Set up of Burma Bridge.

Time Duration:

60 minutes.

Number of Participants:

Any Number.

Preferred Setting:

Indoor/Outdoor.